New Storm Water Headwall Installation In Somerset

POSTED: September 04, 2020

Below Ground Solutions have recently been installing a new Storm water headwall for surface water going into the Washford River In Watchett, Somerset. For Below Ground Solutions this involved months of planning which included environmental surveys for protected wildlife and plants and a permit to discharge from the Environment Agency. Every one involved completed the works and applications on time and within budget.

Pre Cast Head wall ready to be lifted onto concrete base
Lovely weather to be down by the river
forming the concrete base for siting the Headwall
The finished Product in place